National Repository of Grey Literature 21 records found  1 - 10nextend  jump to record: Search took 0.01 seconds. 
Warehouse hall with administration
Dostál, Petr ; Kovařík, Lukáš (referee) ; Brukner, Bohuslav (advisor)
The content of this diploma thesis is the design of a new warehouse hall with administration in the Zetor complex in the Brno – Líšeň district. It is the building thaht is divided into warehouse hall and administrative part. The warehouse hall has one floor and will be used for storage of steel products within the Zetor complex. The administrative part has three floors, where the 1st floor serves as a background for warehouse employees, on the 2nd and 3rd floors there are office space with social facilities. The construction is based on deep foundations on embossed piles. The supporting structure of the building is designed as a prefibricated reinforces concrete skeleton with continuous columns and beams places on the columns. The peripheral shell of the both part sis made of sandwich mineral panels. The supporting structure of the roof of the warehouse hall consists of roof trusses and is made as a flat single-skin. The ceiling construction of the administrative part is made of SPIROLL ceiling panels, the roof of the administration is also made as a flat single-skin.
Production Hall in Černá Hora – Selected Parts of Construction-technological Project
Různar, Daniel ; Štěpán, Richard (referee) ; Motyčka, Vít (advisor)
The topic of my master's thesis are selected parts of the construction technology project Production Hall in Černá Hora with administrative part. Thesis contains engineering report, construction budget, time schedule for the whole construction, deployment of mechanisms and staff, project of construction site, study of the implementation of the main technological stages, the most appropriate construction mechanisms, routes of mechanisms, ranges and travels of mechanisms, financial and time schedule of the main building, technological specification for established pilots and montages of prefabricated skeleton, control and test plan, implementation of pilots, proposals of design of movement mechanisms, comparison of cladding of ventilated facades, skeleton assembly procedure diagrams and noise study of the construction site.
Preparation and organization of ELIT warehouse building in Brno
Boháček, Adam ; Kučera, Zdeněk (referee) ; Kantová, Radka (advisor)
The subject of my diploma thesis is the design of realization of the Elit storage hall in Brno based on the provided project documentation. Part of the thesis is a technical report for a building technology project, a study of the realization of the main technological stages of the building, the situation of the building with wider transport route links, the project of the building site including the technical report of the construction site equipment, the design of the main building machines and mechanisms. Further part of this work are a chapters on the implementation of the supporting structure of the halls, which are the Technological Regulation for the assembly of the prefabricated reinforced concrete skeleton, The Plan for securing the material resources for the assembly of the prefabricated reinforced concrete skeleton and The Assessment of the usability of the mobile cranes for mounting the prefabricated reinforced concrete skeleton. Part of this work is also a variant solution for the implementation of the Densitop MT industrial floor including a price comparison comparison with the original design. From the time and financial point of view, the object time and financial plan is elaborated, followed by the detailed schedule of the main building construction and the itemized budget of the main building, including the bill of quantities. Due to the high demands on the quality and safety of the construction, the chapters of the Quality Control and Testing Plan for Reinforcing the Prefabricated Reinforced Skeleton and the Plan for Safety and Health at Work on the building site are also included.
Modernisation of agricultural building
Seifert, Jan ; Procházka, Jiří (referee) ; Sobotka, Jindřich (advisor)
The project deals with the modernization of the agricultural building which leads to a change of the using building. In an effort was to make use of the building which goes to into ruin and to create jobs in this location. The building is located on the plot no. 212 on the north of outskirts of Opatovice I.. In the area there is a cowshed and a silage trough. The former cowshed will be rebuilt into a woodworking facility constituted by manufacturing and administrative part. The silage trough will be used as a waste stock. A new outdoor wood store will be built in the northwest part of the plot. The administrative building will be added to the main building with a basement made from permanent formwork. The ground floor and the first floor are made of clay bricks and reinforced concrete cross-reinforced slab 150 mm thick. The internal partitions in the 1st floor are made of clay block prartitions 115 mm thick. The internal partitions in the 2nd floor are plasterboard 100 mm thick. Rebuilding involves a large number of demolition work for example new openings in existing walls. The whole woodworking facility will be insulated by a certified thermal insulation system 100 mm thick on the production part and 180 mm thick on the administrative part. The object is covered with saddle roof shaped letter "T" with a sheet metal cover. The original hard landscaping will be replaced by an asphalt road.
Construction technological project of the production hall in Sudoměřice
Kolacia, Tomáš ; Vlčková, Jitka Laura (referee) ; Venkrbec, Václav (advisor)
The subject of the diploma thesis is construction-technological solution for realization of the production hall with administrative part in Sudoměřice. Parts of the thesis are the technical report for the construction-technological project, a study of the realization of the main technological stages of the building, the solution of the wider transport route links, where I designed and assessed selected transport routes. The other parts of the diploma thesis are design of a site equipment with the technical report of the site equipment, design of the main building machines and mechanisms. The time and financial plans of objects are elaborated, followed by the detail time schedule of the realization of the main building obejct with a workers needs diagram and the item budget of the main building object with the bill of quantities. For the proces of the realization of the reiforced concrete prefabricated construction, the technological regulation for the assembly of elements with usability of the mobile crane, was made. In the diploma thesis, the technological regulation for the reiforced concrete cast-in-place columns and bond beams, was also prepared. Due to the high demands on the quality of the construction, the control and test plans for the assembly of the reiforced concrete prefabricated elements and for the cast-in-place columns and bond beams, were also prepared. Within the environmental protection, the requirements for the certification LEED 2009 Core & Shell, were processed.
Truck-servis
Hübner, Daniel ; Spáčil, Miroslav (referee) ; Brukner, Bohuslav (advisor)
The master’s thesis processes project documentation for construction of Truck service, i.e. object for service and maintenance of trucks with built-in administrative part, situated in Letohrad. The proposed building is a onestorey hall, built-in floors are designed in the administrative part and auxiliary operating areas. The main entrance to the building with income for customers is located in the administrative part. Most of the first floor has a service hall with associated workshops and truck wash space. The supporting structure of the building is designed prefabricated reinforced concrete skeleton with continuous columns and girders mounted on short column brackets. The cladding of the service hall is designed with sandwich panels. The cladding of the administrative part is made of Ytong filler masonry. The facade of the administrative part is designed as ventilated. The horizontal load-bearing structures are assembled from Spiroll prestressed reinforced concrete ceiling panels. The roof is designed as typical for hall buildings, i.e. it is flat single-skinned roof with behind attica gutters and between roofs gutters formed by valleys falling down to the roof drains by spreading wedges.
Mixed-use Building in Ledeč nad Sázavou
Nevím, Tomáš ; Pilný, Ondřej (referee) ; Kalousek, Lubor (advisor)
The master thesis designs a mixed-use building in Ledeč nad Sázavou. The thesis consists of three parts. First part presents the project documentation of architectural-construction. Second part proposes the technical equipment of the building. Third part is assessment of the designed building by methodology for multicriteria evaluation of buildings SBToolCZ. The building is located in undeveloped and slightly sloping land. The building has three above-ground floors. There are three different operations in the building, which are a café and an electrical shop and an office part. There is a café, an electrical shop, technical and storage facilities on the first floor. The second and third floor is an office part and company apartment. Structurally, the building is solved by a two-wax load bearing system. The building is founded on footing and foundation slab. Load bearing vertical elements are walls, columns and posts. Externall wall is designed from ceramics block with and mineral insulation. Horizontal load-bearing structures are designed as cast-in-place reinforced slabs. The building has a flat roof. In the building is air condition and cooling system and heating. Part of electricity demand is covered by photovoltaics on the roof. All drawings and visualization are designes in software ArchiCAD.
Production hall with an administrative part in Ústí n Orlicí - Hylváty, civil technological project
Dobrovská, Monika ; Sedlák,, Petr (referee) ; Kovářová, Barbora (advisor)
The subject of the thesis is the construction and technological preparation of a production hall building with an administrative part in Ústí nad Orlicí – Hylváty. For the construction project a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written. The other task includes a comparison of the two building envelope technologies, a contract for work, a plan of risks for the building evelope and pattern moving mechanical assemblies. The subject, which I deal with in this thesis, is in the field of constructions- selected details of the building envelope preparation.
Multifunctional object
Bogner, Michal ; Sládek, Jiří (referee) ; Smolka, Radim (advisor)
The aim of the diploma thesis was to create project documentation the new construction of a multifunctional building in the village of Dýšina. The architecture of the building is determined by the usage purpose. The administrative and residential part is designed as a three-level building and the warehouse part as a single-level one. It is a non-basement construction without a residential attic, a rectangular floor plan with maximum dimension of 63.4 x 26.26 m. The roofing is solved by a gabled roof. The layout and operational solution of the administrative part of the building is primarily focused on the offer of exhibited goods and their sale on the 1st floor. On this floor, there are offices, a shop with exhibited goods, a technical room and sanitary facilities, including toilets for people with reduced mobility. On the 2nd floor, there are commercial and manager offices. There is also a meeting room and a showroom. The residential part on the 3rd floor above the administrative part is divided into 4 residential units. The apartments are accessible from the central corridor. The entrance to the central corridor is secured with an external steel staircase on the north side of the building. The space of the storage hall is not divided to maximize usage of storage area. There is one office (26.95 m2) and storage space (973.65 m2) with a test elevator shaft. The entrance to this part is ensured by three gates and a gate with a ramp for tracks. The storage part is directly connected to the administrative part with a door.
Town planing study "Zbrojovka"
Bílek, František ; Dominik, Vladimír (referee) ; Herzan, Radovan (advisor)
The aim of this thesis is a revitalization of the grounds once belonging to Zbrojovka Brno. These grounds are in the zoning map defined as “brownfield”. Within Brno’s limits, the area has an extremely convenient location. Since the grounds are situated in the central part of Brno, the complex is in terms of traffic and transport in the vicinity of both, the current and the newly planned ring-road. Important factors influencing the project are the river Svitava which borders the west side of the area, and a railroad corridor skirting the east side of the location. Assigned area was, for the purposes of this thesis, expanded by the grounds once belonging to Zetor and the adjoining area towards Markéty Kuncové Street. Several buildings from the former grounds, which fit in into the urban concept and were in good technical conditions, have been preserved. From a functional point of view, the newly designed grounds will meet all the requirements for a fully independent municipal district. The multifunctional development contains primarily housing complexes, administrative buildings, public facilities, recreational areas, as well as other functional structures. The urban concept of this project is a result of a study of surrounding blocks. Based on an analysis of the size and height of these buildings, an idealized block was designed and then recreated into a symmetrical raster of blocks with the street width of 20m. This raster was subsequently applied to newly designed points of entry into the area. Total urban and mass proposal of the development areahas been further influenced by principal conceptual points. Among these conceptual points belong the perspective axes which connect the conceptual points with an orientation point, in this case the former factory’s smokestack. Creating a new arm for the Svitava River is another point. Taking into account that the whole vicinity of the factory grounds is without quality public greenery elements.

National Repository of Grey Literature : 21 records found   1 - 10nextend  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.